Project overheads
The Code of Estimating Practice, seventh edition, published by the Chartered Institute of Building (CIOB) in 2009 suggests that project overheads (sometimes referred to as site overheads, preliminaries, general cost items or expenses) are:
The cost of those site-specific project costs that cannot allocated to individual activities and which are not included in all-in or composite rates. Among other things, these costs may include site management, huts, safety precautions, job-related insurances, bonding costs, telephone, water, electricity costs, etc. The essential characteristic is that these overheads serve more than one activity, e.g. tower crane, skips, general site labour, etc. However, in practice some resources that could be allocated to an activity, e.g. scaffolding for falsework, are included in the preliminaries because of the contractor’s preferred method of pricing. |
See also: Preliminaries.
--CIOB
[edit] Related articles on Designing Buildings Wiki
- Attendance.
- Bills of quantities.
- Chartered Institute of Building.
- Code of Estimating Practice.
- Contract sum.
- Cost consultant.
- Cost control.
- Cost plans for construction projects.
- How to calculate head office overheads and profit.
- Mark-up.
- Method statements.
- New Rules of Measurement.
- Overheads.
- Pre-construction information.
- Preliminaries.
- Prime cost contract.
- Profit and overheads on construction projects
- Provisional sums.
- Standard Method of Measurement.
- Tender documents.
- Tender.
Featured articles and news
Licensing construction; looking back to look forward
Voluntary to required contractors (licensing) schemes.
A contractor discusses the Building Safety Act
A brief to the point look at changes that have occurred.
CIOB Construction Manager of the Year award
Shortlist set to go head-to-head for prestigious industry title.
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.